With our other projects done I was finally able to get the bleed stem programmed and the first side is running. I manually made the second side of one to verify measurements (shown below). I drilled a bit deep, so this one won't seal, but with an accurate adjustment it ought to be right on. Plan on testing this afternoon or tonight!
No comments:
Post a Comment